Thursday, December 17, 2015

"Plan B"...

When Joanie and I started out on our adventure of full timing we knew that we would not be able to do it forever.  We knew that health issues and our age would cause us to come an end sometime.  The question we had then was "What would we do then?".  Where would we park Phaeth for the last time? 
This is the lot before any contractors began work.

 
 
The first thing we did was to put in the water line.  There existed a frost proof  yard hydrant out near the street which when moved back about 60 feet, was perfect for an RV site.  The valve is 18 inches below grade protecting it from freezing.  A 4 foot rod that opens and closes the valve runs down the middle of the water pipe making it very easy and convenient to turn the water on or off.  It also opens (when valve is off) and closes (when valve is open) a weep hole below grade to let water drain out of the stand pipe, preventing it from freezing. Recycling this hydrant saved us some $.

 

At first it seemed like a question with no good answer but after thinking about it, we came up with some.  (1.) We could park in one of the long term campgrounds in Florida, Texas or Arizona and just continually rent the space.  It is difficult to find a good place and they pack you in like sardines.  (2.) We could buy a space in one of the upscale "resort" RV retirement places where there is greater "elbow room" but those were out of our budget range.  (3.) We found out about a progressive nursing RV village in Texas that sounded very nice but Texas is far from any of our relatives or friends that we would like to see.


Next, a septic tank had to be installed.  This system has no drain field.  Instead, it has an electrically operated lift pump which, because the ground here does not "perk", sends the liquid effluent of the tank to a city sewer line. The septic tank had to be vacuum tested  and certified by an inspector against leaks which is what is happening here.



We decided to create our own "alternative" that combined all of the above and give us everything that we wanted.  We decide to build our own permanent campground with plenty of "elbow room", is in a quiet location with moderate weather and close to friends and relatives. 

 
The truck that delivered the septic tank got stuck in the Carolina clay (which is why the ground "don't perk") that makes up most of land along the Neuse River.  The excavator's Bobcat had to help pull it out.  The wet clay is like a powerful vacuum that sucks things down into it.  It is like a very slow liquid that will stick to everything. Cleaning it off requires much water and effort.
 

We found and purchased a lot that is two thirds of an acre on a dead end road on the Neuse River in an unincorporated section of Craven County, near New Bern, North Carolina. We are not "on the river" but are across the street from the waterfront properties. The lots across the street are tax valued ten times greater than what ours cost because of their "waterfront" nature. 

It is far more peaceful and quiet here than in some campground or RV resort.

We bought the lot in June and came back in November to start the "build".  For more than a month we have tried to coordinate contractors, inspectors, city water, sewer and electric providers all while dodging one of the wettest falls this part of the country has seen in a long time.
 
This year's El Niño is causing a record warm December.  I have no problems accepting the warm weather and hope January and February behave themselves, too. But the rain makes it difficult to get work done.
 
 
 


We had a standard 200 amp service installed mostly because it was the least expensive route to go.  From this panel a sub-panel was installed for the sewer lift pump and controller.  From this main panel an RV 50 amp plug was installed.  The breakers for this plug are in the main panel, again to save a few bucks.

The essentials for life while living in an RV, water, sewer and electricity, are finally in and we have moved Phaeth to her new campground, our campground.  I have to admit that it was frustrating at times.  We have a lot of "refining" to do as we have mud all around us.  Maybe we will get a pair of "Wellies" to put on whenever we leave Phaeth.


 The excavation contractor also installed the circular driveway and parking pad of ABC stone gravel.  He had start by striping away the sod.

 


We plan on staying here until Spring,  enjoying the Christmas holidays with our son Chris' family and friend Candle and her family, taking our time doing the "refining".  Should the weather turn too nasty for our taste, we will just drive away.  We have never stayed for this long in one place living in Phaeth. We will need to exercise her every so often to be sure she stays in shape.  We hope to celebrate Chris' birthday then head north to Massachusetts to celebrate Don's and Sherri's birthday. Then, perhaps head West until fall when we will come back to "Plan B".




2 comments:

  1. Earthwork is a vital component in construction. The specialists that work with the earth so that pieces of land are rendered suitable for building are call excavation contractors.
    For more information: excavation contractor Massachusetts

    ReplyDelete
  2. Opening an excavation company could be just as difficult (or even more) as any other business. It will require lots of hard work and determination. The fact of the